T307 - Marine Parade
Today the Land Transport Authority opened the tender for Marine Parade station - Contract T307. The contract is for the construction of Marine Parade station, cut & cover linkway and tunnels towards Marine Terrace station and bored tunnels on both ends of the station. As of now, the tender closes 22nd June.
Sunday, January 25, 2015
Line alignment and structure
Recently, we came across some information and would like to present to you a graphic representation of the East Coast Line's alignment. Also provided is information that shows how the line will be built.
Also listed below is the full number of contracts and the expected TBM drives from the shaft at Gardens by the Bay East, under the Thomson Line section, to Sungei Bedok station.
Also listed below is the full number of contracts and the expected TBM drives from the shaft at Gardens by the Bay East, under the Thomson Line section, to Sungei Bedok station.
![]() |
| Expected tunnel drives under East Coast Line contracts |
Monday, January 5, 2015
Tender schedule
The Thomson-East Coast Line was announced last August by Minister for Transport Lui Tuck Yew. In keeping to the timeline for construction to commence in 2016, tenders are expected to be floated this year and placed up for bids. The pre-qualification for bidding of the contracts was floated late last year. Here is a list of the expected release of the respective contract tenders:
Contract Number
|
Expected timeline for tender being called
|
T301 – Depot
|
2015 Quarter 2
|
T302 – Station E1 + tunnels
|
2015 Quarter 2
|
T303 – Tanjong Rhu (station E2)
|
2015 Quarter 2
|
T305 – Katong Park (station E3) + tunnels
|
2015 Quarter 2
|
T306 – Amber (station E4)
|
2015 Quarter 3
|
T307 – Marine Parade (station E5) + tunnels
|
2015 Quarter 1
|
T308 – Marine Terrace (station E6) + tunnels
|
2015 Quarter 2
|
T309 – Siglap (station E7)
|
2015 Quarter 3
|
T310 – Bayshore (station E8) + tunnels
|
2015 Quarter 2
|
T311 – Bedok South (station E9) + tunnels
|
2015 Quarter 3
|
T312 – Sungei Bedok (station E10) + tunnels
|
2015 Quarter 3
|
T313 – Xilin (station DT36) + tunnels
|
2015 Quarter 1
|
T315 – Tanah Merah modification
|
2015 Quarter 3
|
We have also sorted the table according to quarter for easy reference.
Tuesday, December 2, 2014
Pre-construction: Marine Terrace
Marine Terrace station is located roughly 1km away from Marine Parade station. It serves several HDB blocks and schools in the area as well. This station will see 6 entrances as well, with entrances 1 and 6 on the map below being connected by a pedestrian subway to the main station building.
![]() |
| Indicative map of the station entrance locations |
![]() |
| An artist's impression of one of the entrances - probably entrance 3 outside St. Patrick's School |
Sunday, November 30, 2014
Pre-construction: Marine Parade
Marine Parade estate has long clamoured for an MRT station to connect Singapore's first estate built on reclaimed land with the rest of the island. With the Thomson - East Coast Line (TEL), this wish of the residents here will finally be answered. The station has 6 entrances which stretch over the station itself to the end of the cut-and-cover tunnels next to the station housing the cripple siding for the line.
![]() |
| Indicative locations of the station entrances |
![]() |
| Artist's impression of entrance 6 |
Friday, November 28, 2014
Pre-construction: Amber (Tanjong Katong)
The third announced station is Amber station, located along Tanjong Katong Road South and Amber Road. This station is the deepest along the East Coast sector of the Thomson - East Coast Line (TEL) at 30 metres deep. It will also feature stacked platforms like the Katong Park station and it will have 3 entrances.
![]() |
| Indicative locations of the station's 3 entrances. |
![]() |
| A view of one of the entrances, likely entrance 3 along Tanjong Katong Road South. |
Wednesday, November 26, 2014
Pre-construction: Katong Park
Katong Park station sits right next to the Katong Park along Fort Road. This station will feature a stacked platform and is the second deepest station along the East Cost stretch of the Thomson - East Coast Line (TEL), at 29 metres. The station will have two entrances, one along Fort Road and another along Meyer Road.
![]() |
| Artist's impression of entrance along Fort Road. |
![]() |
| A station map with the indicative locations of the entrances labelled |