![]() |
Alignment map of the Thomson-East Coast Line Extension (TELe). Source: LTA |
Yesterday, the Land Transport Authority (LTA) announced a 14km extension to the Thomson-East Coast Line (TEL). The extension consists of 1 new station at Changi Terminal 5 and new tunnels of 7.6km that will connect the 6th phase of the line to the existing stations along the Changi Airport Line (CAL). The three existing stations along the 6.4km long CAL will be absorbed into the TEL as well.