Sunday, January 25, 2015

Line alignment and structure

Recently, we came across some information and would like to present to you a graphic representation of the East Coast Line's alignment. Also provided is information that shows how the line will be built.

Source: LTA
The layout of the East Coast Line alignment. This diagram shows the locations of the stations, launch shafts as well
as areas where there will be cut-and-cover works. The number of TBMs are also indicated as well as locations
of stacked tunnel configurations. In addition, there are 2 temporary staging areas (TSA) that will be used for trackworks.

Also listed below is the full number of contracts and the expected TBM drives from the shaft at Gardens by the Bay East, under the Thomson Line section, to Sungei Bedok station.

Expected tunnel drives under East Coast Line contracts

No comments:

Post a Comment