Showing posts with label T316. Show all posts
Showing posts with label T316. Show all posts

Saturday, July 26, 2025

TELe - Officially announced

Alignment map of the Thomson-East Coast Line Extension (TELe).
Source: LTA

Yesterday, the Land Transport Authority (LTA) announced a 14km extension to the Thomson-East Coast Line (TEL). The extension consists of 1 new station at Changi Terminal 5 and new tunnels of 7.6km that will connect the 6th phase of the line to the existing stations along the Changi Airport Line (CAL). The three existing stations along the 6.4km long CAL will be absorbed into the TEL as well.

Thursday, November 28, 2024

T316 - Changi bound tunnel completed

 

November 2024
Source: LinkedIn

Earlier, we posted that tunneling for the Woodlands-bound tunnel under contract T316 had been completed in late October. We have recently come across a photo indicating that tunneling on the Changi-bound (in future Tanah Merah-bound) tunnel was completed this month as well. Congratulations to the Shanghai Tunnel Engineering Co team on the successful completion of both bounds!

This post will also be available on Instagram & Facebook.

Thursday, November 14, 2024

T316 - Woodlands bound tunnel completed

 

27 October 2024 - 1421 tunnel rings completed for the Woodlands-bound tunnel under
contract T316.
Source: Instagram

Recently, the team came across a small update for the TEL Extension contract T316 which was for the construction of twin bored tunnels connecting to the existing Changi Airport MRT station from the vicinity of the future Terminal 5. On the 27th October, tunnel boring works for the Woodlands-bound tunnel were completed with 1421 rings constructed. A hearty congratulations to the Shanghai Tunnel Engineering Co on the achievement!

This post will also be available on Instagram & Facebook on 15 November 2024.

Tuesday, May 7, 2024

T316 - The first of TELe contracts

 

April 2022 - A view from within the launch shaft.
Source: LinkedIn

The Thomson-East Coast Line extension (TELe) was first unveiled in 2019 during the Land Transport Masterplan for 2040. This extension involves continuing on the TEL from its upcoming eastern terminus at Sungei Bedok, running through Changi Airport's Terminal 5 before joining up with taking over the existing Changi Airport Line that runs to Tanah Merah. Not everyone would know though, that the first civil contract for the extension has already been awarded and construction going on for some time. That contract is none other than contract T316 for the construction of twin bored tunnels. Here's a extract of the contract's scope from Shanghai Tunnel Engineering Co (STEC)'s website:

Contract T316 covers the construction and completion of twin bored tunnels from Changi Airport Terminal 5 (T5) development towards Changi Airport (CGA) Station Terminal 2 (T2) North Finger Pier. It also includes construction and completion of associated cross passages, launch shaft, underground infrastructure, tunnels low point sumps and the associated ancillary works.