Monday, March 28, 2016

T309 - Siglap

Contract T309 was awarded last week to a joint venture of John Holland and Zhen Hua Engineering. The contact is for the construction of Siglap station structure only. For contract T309, there will be no tunnel works involved - similar to Bencoolen, Geylang Bahru and Kaki Bukit stations along the Downtown Line stage 3.

Schematic map showing the construction methodology of Contract T309 for Siglap station.
Self produced graphic.

This station was designed by Arup under contract E1002 which also covered Bedok South, Bayshore and Marine Terrace stations.

A render of one of the entrances to Siglap station along Marine Parade Road.
Source: Land Transport Authority

Another render of an entrance to Siglap station.
Source: Land Transport Authority

No comments:

Post a Comment