Today the Land Transport Authority released the pre-qualification for contracts on the East Coast sector of the Thomson - East Coast Line. The following contracts are open for pre-qualification:
T301 - Construction of the 4-in-1 depot
T302 - Construction of station E1 and bored tunnels
T303 - Construction of Tanjong Rhu station (E2) and cut & cover tunnels
T305 - Construction of Katong Park station (E3) and bored tunnels
T306 - Construction of Amber station (E4)
T307 - Construction of Marine Parade station (E5) and cut & cover tunnels and bored tunnels
T308 - Construction of Marine Terrace station (E6) and cut & cover tunnels and bored tunnels
T309 - Construction of Siglap station (E7)
T310 - Construction of Bayshore station (E8) and cut & cover tunnels and bored tunnels
T311 - Construction of Bedok South station (E9) and bored tunnels
T312 - Construction of Sungei Bedok station (E10) and cut & cover tunnels
T313 - Construction of Xilin station (DT36) and cut & cover tunnels
T315 - Modifications to Tanah Merah station (EW4)
Of all the East Coast Line stations, Katong Park and Amber stations will feature stacked platforms. The rest of the stations will feature single-level platforms.
No comments:
Post a Comment