Layout & numbering of exits at Sungei Bedok station. |
|
17 March 2024 - A view of road reconfiguration works looking westwards to Bayshore. |
Contract T312 is for the construction of Sungei Bedok station and associated cut & cover tunnels to the west of the station. These tunnels will house tracks allowing trains to switch directions before or after leaving the station on their westward journeys towards Woodlands North once operational. As a result of the construction technique chosen, there is some incidental space above the tracks which will be sealed up initially. The long-term plan is that this space can eventually be leased out as commercial space - be it for retail, food & beverage or even potentially offices or education centres.
This section of incidental space stretches from the location of the current Upper East Coast bus terminal up to Exits 1 and 2 of the Sungei Bedok station. Due to provisions for fire evacuation once the incidental space is opened up for commercial use in future, several emergency egress points need to be constructed, resulting in the numerous surface structures seen along Upper East Coast Road between the bus terminal and the station building. These structures are often confused by passersby as part of the station building.
|
10 February 2024 - A view of the future commercial area emergency exit just outside the Upper East Coast bus terminal. These emergency egress points are often mistaken for the station building itself. |
|
10 February 2024 - A view of the final emergency exit for the future commercial space, with Exit 1 behind, along Upper East Coast Road. |
|
10 February 2024 - A view of Exit 1 along Upper East Coast Road. |
|
10 February 2024 |
|
10 February 2024 - Cladding works underway at Exit 1.
|
|
10 February 2024 - A close up view of cladding works at the lift shaft of Exit 1.
|
|
10 February 2024 - A close up view of cladding works at the lift shaft of Exit 1.
|
|
10 February 2024 - A close up view of cladding works at the lift shaft of Exit 1.
|
|
10 February 2024 - Exit 2 along Upper East Coast Road, just outside the Bedok Food Centre. |
|
10 February 2024 - Paving works underway outside Exit 2. |
|
10 February 2024 - Road paving works in progress near Exit 2.
|
|
10 February 2024 - A view of Exits 3 and 4 further east. |
|
10 February 2024 - Ventilation and ancillary buildings further east, outside Laguna Golf Course. |
|
10 February 2024 - A close up view of one of the ancillary buildings. |
|
10 February 2024 - A close up of the ventilation building. |
|
10 February 2024 - A view of Exits 1 and 2 looking further west. |
|
17 March 2024 - An ancillary building at the eastern end of the station. |
|
17 March 2024 - A view of Exit 2 in the evening. |
|
17 March 2024 - The road paving has been completed outside Exit 2, with the roadway now much closer to the station exit building than before.
|
|
17 March 2024 - Temporary jersey barriers in front of Exit 2 to separate the carriageways.
|
|
17 March 2024
|
|
17 March 2024 - Exit 2 seen from across the road.
|
|
17 March 2024 - A view eastwards to Exits 3 and 4 in the distance.
|
|
17 March 2024 - Exit 1 as seen from across Upper East Coast Road. |
|
17 March 2024 - Part of the new roadway in front of Exit 1. |
|
17 March 2024 - A view of Exits 1 and 2 in the evening. |
|
17 March 2024 - A view of the progress at Exit 1. |
|
17 March 2024 - A bus stop or pick-up/drop-off shelter under construction. |
|
17 March 2024 - A view of the bus stop/pick-up & drop-off shelter & covered linkway being built. |
|
17 March 2024 |
|
17 March 2024 - Covered linkway works in progress. |
|
17 March 2024 - Work is ongoing at the road median. |
|
17 March 2024 - Temporary openings to allow pedestrians to cross the roadway. |
|
17 March 2024 - The old westbound carriageway. With road reinstatement underway, the new westbound carriageway is now located behind the hoarding. |
Over the past quarter, works have been progressing at the station site with the reinstatement of the eastbound carriageway around Exit 2. The westbound carriageway was recently shifted onto the permanent roadway next to Exit 1. A new road median is being constructed at the end of Upper East Coast Road where it turns into Bedok Road. This section of the road will be turned into a T-junction in future when a roadway is built across the station to connect to Laguna Golf Green.
The contractor for the station has also recently launched a Telegram channel to provide updates for the contract. A recent circular provides residents and stakeholders an idea of the upcoming works over the next quarter moving forward.
|
Circular for upcoming works in Q2 2024. |
|
QR code for T312's Telegram channel. |
This post will be available on Instagram & Facebook on 24 April 2024.