Thursday, March 30, 2023

T307 - Marine Parade Q1 2023 update

 

23 March 2023 - A view of Exits B and A along Marine Parade Road.

Marine Parade station under contract T307, appears to be the slowest moving among all the 7 stations under the Thomson-East Coast Line (TEL) phase 4 that will be operational next year. That said, the station is definitely not on the level of completion that Great World station along TEL3 was in the months and weeks leading up to that section's opening.

Layout
Just to recap, the contract site is divided into 2 sections - the station and the commercial subway. The station portion is where the platform will be located as well as other functions of the station proper. This is located to the west, just outside Parkway Parade shopping centre & Marine Parade central. Exits A to C connect to this section. To the east is the commercial subway, a retail link built above the cripple siding one level below in the running tunnels. Exits D to F are connected to this section.

An aerial perspective showing the station's exit layout.

Exit A
This exit is connected to the station building and is located along Marine Parade Road, outside Roxy hotel opposite Parkway Parade. It will be the main exit used for getting bicycles down to the concourse level bicycle parking space. Works are ongoing to install the elevator components while the roadway outside is being restored. Presumably, commuter infrastructure will be installed for the pick up-drop off & bus shelter.

23 March 2023 - Exit A with roadway restoration underway.

23 March 2023 - Elevator installation in progress.

23 March 2023 - A view of Exit A from the road in front of Roxy hotel.

23 March 2023 - A view of Exit A from Parkway Centre.

Exit B
This exit will also be connected to the station concourse level and features an integrated ventilation shaft/cooling tower on top. Equipment is being installed whilst the exit structure has just begun cladding works. The detailing of the design of the exit features black lines that look like modern, refined vines.

23 March 2023 - A view of the integrated ventilation shaft/cooling tower
on top of the exit structure.

23 March 2023 - Exit B seen from the service road parallel to Marine Parade Road.

23 March 2023 - Fittings installed for the ventilation structure.

23 March 2023 - A view of the exit as seen from Marine Parade Road.

23 March 2023 - A close up view of the external design of the exit featuring the black vine-like
lines and some recently installed cladding.

23 March 2023 - An aerial view of Exit B.

Exit C
This exit is the third that will connect to the station concourse level and is next to Parkway Centre. Works are underway for the metal roof frame. A long subway will connect Marine Parade Central to the station box and restoration work is ongoing at street level.

23 March 2023 - An aerial view of the exit under construction next to Parkway Centre.

23 March 2023 - A view of the exit seen from Parkway Parade.

23 March 2023 - A view of the exit under construction next to Parkway Centre.

Exit D
This exit is the first of several that will connect to the commercial linkway above the cripple siding. Located next to one of the HDB precincts, the exit is nestled between HDB blocks and is currently having its metal roof frame installed.

23 March 2023 - An aerial view of Exit D with other exits in the
background.

23 March 2023 - A close up view of on-going works at the exit.

23 March 2023 - A street level view of the exit under construction.

Exit E & F
The remaining 2 exits are also located along Marine Parade Road and will connect to the commercial & retail linkway. Works at both exit are focused on the installation of the metal roof frames.

23 March 2023 - An aerial view of Exit E with the escalator section at the front and the lift towards
the back of the exit structure.

23 March 2023 - The structure in the middle is likely an emergency
exit for the commercial & retail linkway.

23 March 2023 - Exit F, opposite the former Marine Parade Community
Club, can be seen next to 2 buses along Marine Parade Road.

23 March 2023 - A street-level view of Exit E under construction.

TEL Tracker
Here's the TEL Tracker for your consolidated reference of progress of the stage 4 and 5 stations along the TEL.


This post is also available on Instagram & Facebook.

No comments: